The City of Cape maintains more than 230 miles of street and 22 miles of alleyways, which is roughly the same distance as a drive to St Louis and back. Some roadway in Cape Girardeau is privately owned or maintained by other agencies (such as Kingshighway). Street maintenance efforts are coordinated by both our Public Works and Community Development departments using funding from the General Fund, Capital Improvement Sales Tax, other sources when available, but mostly the Transportation Trust Fund sales tax.
The following is a list of our projects that are in progress, coming soon, or recently complete.
In Progress
All construction schedules are subject to change due to weather, staffing, material availability, and other factors. Always be intensely cautious when driving near workers and construction zones.
🔶 Lexington Avenue (TTF6)
Construction began March 2024 and will take 18 months to renovate Carolina Lane to Sherwood Drive, and West Cape
Rock Drive to Big Bend Road. Final completion of the total project is anticipated before October 2025. From Perryville to Sherwood remains closed.
🔶 S. Sprigg Street – Shawnee to Southern Expressway
Construction began March 2025, with the
10-month project scheduled to be substantially completed by the end
of 2025. Truck and other commuter traffic will be detoured via Kingshighway. Only local traffic will be permitted within the project boundaries for residents and businesses. Two blocks will be closed at at time with detours posted.
🔶 Various Repairs - Annual Funding from Transportation Trust Fund tax
Construction will be complete by July 23, 2025.
- Two blocks of South Frederick - Complete
- Two blocks of South Middle Street - Complete
- Two blocks of South Jefferson Avenue - Complete
- Cape Rock Drive from Kingshighway to Perryville will reopen by May 2025.
- Perryville Road from Lexington to Sherwood will close in May 2025.
Concrete to be finished by Dec. 31, 2025
- Themis Street (Silver Springs Rd. to Mt Auburn Rd.)
- Jan Dr. (Edgewood Rd to Nancy Ln.)
- Janet Dr. (Brookwood Dr. to Randol Ave.)
- Magnolia Ave (Grandview Dr. to Delwin St.)
- Westfield Dr. (Sycamore Cir. to Mt Auburn Rd.)
- Percy Dr. (Mt Auburn Rd. to Farrar Dr.)
- Minnesota (Southern Expressway to Rust Ave)
Asphalt 2025
- Fountain St. (Washington Ave to North St.)
- Olive St. (N. Fountain St to N. Middle St.)
- N. Middle (Amethyst St. to Olive St.)
- Vincent Ave. (Timon Way to E. Cape Rock Dr.)
- Vincent Park Dr. (Country Club Dr. to End of Asphalt)
- Wayne St. (Perry Ave to N. West End Blvd.)
- Karen Dr. (Erna St. to Jean Ann Dr.)
- Erna St. (N. Cape Rock Dr. to Karen Dr.)
- Dorothy St (From 1118 Dorothy St. to 1069 Dorothy St.)
- Redwood Dr. (Lear Dr. to Vista Ln.)
- Hazel Dr. (W. Rodney Dr. to Hawthorne Rd.)
- Bevin Dr. (W. Rodney Dr. to End of Right of Way)
- Sherri Dr. ( Edgewood Rd. to End of Asphalt)
- Nancy Ln. (Bloomfield Rd. to Jan Dr.)
🔶 Various Repairs - Annual Funding from Capital Improvement Sales Tax
The improvements consist of removing and replacing concrete panels, removal and replacement of portions of street, curb, and gutter, adjustments to existing manholes, inlets, and utility castings.
- 741 Forest Avenue (completed)
- 2050 to 2061 Corporate Circle, 823 to 2365 Rust Avenue (completed)
- 100 block of S. Farrar Drive (completed)
- 2810 to 2846 Whitener Street
- Whitener Street and N. Silver Springs Road intersection
- 2311 to 2331 Bloomfield Road
- 1439 to 1491 S. Minnesota Avenue
- 1600 – 1700 Greenbrier Dr
🔶 Everyday, short-term rapid repairs, such as a pothole fill, are not listed in addition to periodic concrete repairs by staff (General Fund supported).