Our Storm Water Division
Checks 812 locations each rain event
Cleans catch basins, grates and driveway pipes
Maintains 200 miles of storm water facilities over 5 watersheds
SCADA System Monitors
5 - Creek Level Locations
1 - Detention Basin
8 - Remote Rain Gauges
Mows 44 detention areas 12 times per year each on average
Maintains Cape LaCroix and Walker Branch Channels
Installs Gabion Boxes
Repairs low water crossings
Repairs erosion
Removes trees and brush from drainage areas
12 Capital Improvement Program Projects identified - Estimated Cost $3,000,000
Storm Water System and Water Pollution Control Methods are in accordance with MS4 Water Quality Permits
EPA Clean Water Information
Missouri DNR Clean Water Information
Maintains 7,850 foot Levee System with 5 closures and 2 pump stations
Provides mosquito fogging 3 days per week for 6 months per year
How to Protect Your Home Against Mosquitoes